You don't have javascript enabled. Good luck with that.
Pencarian
 Pembuatan Turap Anak Kali Semanan di Duri Kosambi Capai 80 Persen

Semanan River Plaster Construction in Duri Kosambi Reaches 80 Percent

West Jakarta Water Resources Sub-agency constructs Semanan River plaster at Duri Kosambi Baru Housing Complex, RT 02/02, Duri Kosambi, Cengkareng.

to prevent erosion

West Jakarta Water Resources Sub-agency Head, Purwanti said the plaster construction is applied on both sides by 193 meter-long and three meter width each.

"The construction is a continuation project to prevent erosion and flow the water smoothly," she said, Friday (11/29).

Orange Personnel Clean Collapsed Plaster Material on Jalan Birah III

According to her, the construction has been running since April 24, 2024 by involving 12 personnel.

"Now the work has reached 80 percent and is targeted to complete next month," she added.

Meanwhile, Jhon Herry (45), Duri Kosambi Housing Complex security officer, supports the plaster construction.

"Local residents support the plaster construction. It can prevent erosion and make environment tidier," he admitted.

Linked News
Popular News indeks
  1. Still Rp 3,500! No Fare Change for Transjakarta’s Kalideres–Soetta Route

    access_time01-08-2026 remove_red_eye565 personAldi Geri Lumban Tobing
  2. New LapakMain Corner Creative Hub Inaugurated at Tunas Muda RPTRA, Kramat Pela

    access_time05-08-2026 remove_red_eye565 personTiyo Surya Sakti
  3. Jakarta Claims Rp 2.27 T in Public Assets from Developer Obligations

    access_time06-08-2026 remove_red_eye493 personDessy Suciati
  4. East Jakarta Red Cross Provides Aid to Utan Kayu Utara Fire Survivors

    access_time07-08-2026 remove_red_eye419 personNurito
  5. Jakarta Gov Revs Up Efforts to Become Indonesia's Sport Tourism Hub

    access_time01-08-2026 remove_red_eye416 personFolmer